Twenty-five projects from three decades of public and private work, with the role, value, dates and people behind each one.

All projects

Sort
View
  1. 2024 Yanchep Rail Extension Transport Architectural Lead $716m $716m · Architectural Lead Details
    Yanchep Station canopy over a landscaped forecourt of limestone boulders

    Alkimos and Eglinton stations and the Yanchep Station feasibility study, on the line from Butler to Yanchep. Each station pairs two 150 m platforms with a bus interchange and up to 1,000 car bays.

    Role
    Architectural Lead
    Value
    $716m
    Date
    2024
    Sector
    Transport

    Key personnel

    • Brett Priest — design workshops with METRONET, landowners and local authorities
    • Alun Wheeler — documentation management

    Source: MPS Architects project notes. Photo: METRONET.

  2. 2001–2008 Perth Underground & Elizabeth Quay stations Transport Station Design Team Member, with Hassell $330m $330m · Station Design Team Member, with Hassell Details
    Escalators and stairs descending to the platforms at Perth Underground Station

    Two underground CBD stations and 2.5 km of twin-bored tunnel for the South West Metropolitan Railway, built by the Leighton and Kumagai Gumi joint venture.

    Role
    Station Design Team Member, with Hassell
    Value
    $330m
    Date
    2001–2008
    Sector
    Transport

    Key personnel

    • Brett Priest — MPS Project Representative

    Source: MPS Architects project notes.

  3. 2021–ongoing Midland Station Transport Project Architects with Coniglio Ainsworth Architects $260m $260m · Project Architects with Coniglio Ainsworth Architects Details
    Render of the new Midland Station, its red steel fins rising over the forecourt

    A new station closer to the heart of the Midland Town Centre: platforms for the urban and regional networks, a pedestrian overpass open 24/7, a 12-stand bus interchange and a multi-storey car park with more than 800 bays.

    Role
    Project Architects with Coniglio Ainsworth Architects
    Value
    $260m
    Date
    2021–ongoing
    Sector
    Transport

    Key personnel

    • Brett Priest — Project Director, Artistic Director
    • Jean-Luc Soldatic — Digital Engineering Lead, Project Lead
    • Miles Scott — Documentation, Design Development Lead
    • Michael Senior — Senior Draftsperson, Construction Detailing
    • Kim Doan, June He, Angus Gregg — Documentation

    Source: MPS Architects project notes. Image is a render.

  4. 2014–2017 Aubin Grove Station Transport Project Architects with Coniglio Ainsworth Architects $52m $52m · Project Architects with Coniglio Ainsworth Architects Details
    Aubin Grove Station at night, the lit overpass spanning the Kwinana Freeway and rail line

    An island platform in the Kwinana Freeway median, linked to car parks on both sides by a covered overpass. The station faces north, not south as first planned, and was built while the Mandurah line and the freeway kept running.

    Role
    Project Architects with Coniglio Ainsworth Architects
    Value
    $52m
    Date
    2014–2017
    Sector
    Transport

    Key personnel

    • Brett Priest
    • Alun Wheeler

    Source: MPS Architects project notes.

  5. 2001–2008 Wellard Station Transport Architectural Lead $45m $45m · Architectural Lead Details
    Wellard Station entry canopy lit at dusk

    A bus and rail interchange in a cutting on the Mandurah line, built in a tight freeway median under an operating railway, with a 40-year minimum service life for station structures.

    Role
    Architectural Lead
    Value
    $45m
    Date
    2001–2008
    Sector
    Transport

    Key personnel

    • Brett Priest — Design Manager, Superintendent’s Representative
    • Alun Wheeler — Documentation Manager

    Source: MPS Architects project notes.

  6. 2012 Curtin University Building 305 Education Design, Documentation, Contract Administration $35m $35m · Design, Documentation, Contract Administration Details
    Curtin University Building 305 entry steps and canopy

    The former Chemistry building turned into a Biomedical and Biomolecular Research Building, with PC and TC laboratories and an isotope suite. The largest of MPS’s Curtin packages.

    Role
    Design, Documentation, Contract Administration
    Value
    $35m
    Date
    2012
    Sector
    Education

    Key personnel

    • Brett Priest — Design Manager, Superintendent’s Representative
    • Vitas Silvestri — Design Development, Documentation

    Source: MPS Architects project notes.

  7. 2018–2020 PAPL Skybridge Infrastructure Design Architects $31m $31m · Design Architects Details
    The Perth Airport skybridge meeting the terminal building above the forecourt

    A 270 m elevated walkway joining Perth Airport’s T1 and T2 terminals to Airport Central Station. The first design, by others, was more than double the budget; MPS joined Georgiou Group’s team to deliver a pragmatic one.

    Role
    Design Architects
    Value
    $31m
    Date
    2018–2020
    Sector
    Infrastructure

    Key personnel

    • Brett Priest — Project Director
    • Alun Wheeler — Design and Documentation Manager
    • Michael Senior — Senior Draftsperson, Construction Detailing

    Source: MPS Architects project notes.

  8. 2015–2016 Edgewater Multi-Storey Car Park Infrastructure PTA Design Reviewer and acting PTA Project Engineer $30m $30m · PTA Design Reviewer and acting PTA Project Engineer Details
    Edgewater car park with its curved red screen of vertical fins

    Design review and construction-phase assurance for the PTA on a design-and-construct car park, checking the contractor’s work against the BCA, Australian Standards and PTA requirements.

    Role
    PTA Design Reviewer and acting PTA Project Engineer
    Value
    $30m
    Date
    2015–2016
    Sector
    Infrastructure

    Key personnel

    • Brett Priest — PTA Project Engineer

    Source: MPS Architects project notes.

  9. 2012–2014 John Butler Primary College Education Design, Documentation, Contract Administration $25m $25m · Design, Documentation, Contract Administration Details
    John Butler Primary College courtyard with shade sails and native planting

    A primary college with inclusive education throughout, including a special teaching hub with a hydrotherapy pool. Staged so building work could start before the earthworks contract finished.

    Role
    Design, Documentation, Contract Administration
    Value
    $25m
    Date
    2012–2014
    Sector
    Education

    Key personnel

    • Brett Priest — Project Director, Design Manager
    • Vitas Silvestri — Project Lead, Superintendent’s Representative
    • Alun Wheeler — Compliance Manager
    • Rogerio Cruz — Master plan, design development, documentation

    Source: MPS Architects project notes.

  10. 2018–2020 Brabham Primary School Education Lead Consultant: Design, Documentation, Contract Administration $20m $20m · Lead Consultant: Design, Documentation, Contract Administration Details
    Brabham Primary School forecourt with coloured geodesic play sculptures

    Appointed lead consultant from the BMW architectural services panel of six firms. Administration, library, early childhood, education support and special teaching blocks around shared courts.

    Role
    Lead Consultant: Design, Documentation, Contract Administration
    Value
    $20m
    Date
    2018–2020
    Sector
    Education

    Key personnel

    • Brett Priest — Project Director, Design Manager
    • Vitas Silvestri — Project Lead, Superintendent’s Representative
    • Alun Wheeler — Documentation Manager
    • Rogerio Cruz — Documentation

    Source: MPS Architects project notes.

  11. 2016–2018 Pilbara Institute, Pundulmurra Education Design, Documentation, Contract Administration $12m $12m · Design, Documentation, Contract Administration Details
    Pilbara Institute Health and Community Services Training Building with green and orange cladding

    A new Health and Community Services Training Building, car park and campus circulation. MPS was one of three BMW panel architects invited to submit.

    Role
    Design, Documentation, Contract Administration
    Value
    $12m
    Date
    2016–2018
    Sector
    Education

    Key personnel

    • Brett Priest — Project Architect
    • Vitas Silvestri — Documentation, Contract Administration
    • Michael Senior — Senior Draftsperson
    • Rogerio Cruz — Design development, code compliance

    Source: MPS Architects project notes.

  12. 2006–2009 Victoria Park Station Transport Project Architects and Lead Consultant $10m $10m · Project Architects and Lead Consultant Details
    Victoria Park Station overpass and platform canopy behind the car park

    A replacement island-platform station on the Armadale line, with a pedestrian overpass connecting the suburb on both sides of the rail corridor.

    Role
    Project Architects and Lead Consultant
    Value
    $10m
    Date
    2006–2009
    Sector
    Transport

    Key personnel

    • Brett Priest — Design Manager
    • Alun Wheeler — Documentation, Superintendent’s Representative

    Source: MPS Architects project notes.

  13. 2002–2006 Armadale Station Transport Project Architects $9m $9m · Project Architects Details
    Armadale Station clock tower and civic plaza

    A replacement station used to renew the town centre, with a civic space and offices for PTA staff, designed with the Armadale Redevelopment Authority to sit with the heritage Post Office.

    Role
    Project Architects
    Value
    $9m
    Date
    2002–2006
    Sector
    Transport

    Key personnel

    • Brett Priest — Design Manager, Superintendent
    • Alun Wheeler — Documentation

    Source: MPS Architects project notes.

  14. 2016–2018 Mt Claremont Bus Depot Infrastructure Project Architects $7.8m $7.8m · Project Architects Details
    Mt Claremont bus depot wash bay and workshop after rain

    A new Transperth depot on a 1.2 ha site: four-bay workshop, administration, refuelling, bus wash and hardstand for up to 55 buses.

    Role
    Project Architects
    Value
    $7.8m
    Date
    2016–2018
    Sector
    Infrastructure

    Key personnel

    • Brett Priest — Director
    • Alun Wheeler — Design
    • Michael Senior — Documentation, Construction Control

    Source: MPS Architects project notes.

  15. 2017–2019 Silver Processing Lab Industrial Design, Documentation, Contract Administration $7m $7m · Design, Documentation, Contract Administration Details
    Interior of the silver processing building with steel stair and services

    1,700 m² of new industrial building — granulation and casting, laboratories, offices and plant — built inside an operating refinery site.

    Role
    Design, Documentation, Contract Administration
    Value
    $7m
    Date
    2017–2019
    Sector
    Industrial

    Key personnel

    • Brett Priest — Project Director
    • Vitas Silvestri — Project Lead, Superintendent’s Representative
    • Michael Senior — Documentation

    Source: MPS Architects project notes.

  16. 2014 Claremont Council Chamber Civic & community Design, Documentation, Contract Administration $5.8m $5.8m · Design, Documentation, Contract Administration Details
    Claremont Council Chamber extension, a timber-lined frame beside the heritage building

    The fire-damaged, heritage-listed chamber restored, with a three-storey extension that contrasts in form and ties back through its materials.

    Role
    Design, Documentation, Contract Administration
    Value
    $5.8m
    Date
    2014
    Sector
    Civic & community

    Key personnel

    • Brett Priest — Project Director, Masterplan, Project Architect
    • Rogerio Cruz — Documentation
    • Zsolt Zombori — Design Development, Documentation

    Source: MPS Architects project notes.

  17. 2015–2017 Assay Laboratory Industrial Design, Documentation, Contract Administration $5m $5m · Design, Documentation, Contract Administration Details
    Wet laboratory benches and fume cupboards in the new assay laboratory

    A new laboratory building with wet and dry labs, offices and plant, built within an operating facility to support expanded foundry capacity.

    Role
    Design, Documentation, Contract Administration
    Value
    $5m
    Date
    2015–2017
    Sector
    Industrial

    Key personnel

    • Brett Priest — Project Director
    • Vitas Silvestri — Project Lead, Superintendent’s Representative
    • Michael Senior — Documentation

    Source: MPS Architects project notes.

  18. 2007–2010 Karrinyup Bus Depot Infrastructure Project Architects, Superintendent $5m $5m · Project Architects, Superintendent Details
    Karrinyup bus depot administration building

    A replacement depot for the north-west metropolitan fleet, with maintenance pits, diesel and gas refuelling and a wash for rigid and articulated buses.

    Role
    Project Architects, Superintendent
    Value
    $5m
    Date
    2007–2010
    Sector
    Infrastructure

    Key personnel

    • Brett Priest — Project Architect, Superintendent
    • Alun Wheeler — Documentation

    Source: MPS Architects project notes.

  19. 2009–2010 Curtin University Buildings 303–308 Education Design, Documentation, Contract Administration $4m $4m · Design, Documentation, Contract Administration Details
    Elevated covered walkway linking Curtin University buildings

    Three 1960s buildings refurbished as flexible teaching space, with a lift, ramps and covered walkways laid over the existing canopies.

    Role
    Design, Documentation, Contract Administration
    Value
    $4m
    Date
    2009–2010
    Sector
    Education

    Key personnel

    • Brett Priest — Lead Architect
    • Michael Stewart — Design Documentation

    Source: MPS Architects project notes.

  20. 2017–2018 Redcliffe Bus Depot Infrastructure Project Architects $3.7m $3.7m · Project Architects Details
    Refurbished Redcliffe bus depot workshop

    Full refurbishment of a PTA depot on a 1.86 ha site to bring it up to current building code requirements.

    Role
    Project Architects
    Value
    $3.7m
    Date
    2017–2018
    Sector
    Infrastructure

    Key personnel

    • Brett Priest — Director
    • Alun Wheeler — Design
    • Michael Senior — Construction Support

    Source: MPS Architects project notes.

  21. 2007–2008 Curtin University Hayman Hall & Philips Theatre Education Design, Documentation, Contract Administration $3.5m $3.5m · Design, Documentation, Contract Administration Details
    Hayman Hall entry under mature trees on the Curtin campus

    The campus’s main hall reworked as a multi-function space, a formal student theatre built upstairs, and a new toilet block, kitchen and courtyard.

    Role
    Design, Documentation, Contract Administration
    Value
    $3.5m
    Date
    2007–2008
    Sector
    Education

    Source: MPS Architects project notes.

  22. 2014–2016 WCIT Q Block Simulation Hospital Education Design Architects $2.6m $2.6m · Design Architects Details
    Simulation hospital ward used for nursing training

    A simulated hospital in Q Block at the West Coast Institute of Training’s McLarty Ave campus, for students in nursing and allied health.

    Role
    Design Architects
    Value
    $2.6m
    Date
    2014–2016
    Sector
    Education

    Key personnel

    • Rogerio Cruz — Documentation
    • Mirari Ziaurriz — Design, Documentation
    • Robert Forbes — Documentation

    Source: MPS Architects project notes.

  23. 2004–2005 Noongar Alcohol & Substance Abuse Services Civic & community Project Architects, Superintendent $2.5m $2.5m · Project Architects, Superintendent Details
    Low brick and yellow-clad building of the Noongar Alcohol and Substance Abuse Services

    Offices around a tall central foyer and internal courtyards for light and outlook. The building signals its purpose through landscape, planning and colour.

    Role
    Project Architects, Superintendent
    Value
    $2.5m
    Date
    2004–2005
    Sector
    Civic & community

    Key personnel

    • Brett Priest — Design Architect, Superintendent
    • Alun Wheeler — Documentation

    Source: MPS Architects project notes.

  24. 2024–ongoing Karratha TAFE Student Hub Education Design, Documentation, Contract Administration $1.5m $1.5m · Design, Documentation, Contract Administration Details
    Render of the Karratha TAFE student hub canopy and garden

    For the Department of Finance: a worn TAFE cafeteria turned into a student hub for food, breakout study and digital access.

    Role
    Design, Documentation, Contract Administration
    Value
    $1.5m
    Date
    2024–ongoing
    Sector
    Education

    Key personnel

    • Brett Priest — Project Director
    • Vitas Silvestri — Project Lead, Superintendent’s Representative
    • Rogerio Cruz — Documentation
    • Sally McBride — Interiors

    Source: MPS Architects project notes. Image is a render.

  25. 2022–ongoing Clean Energy Training Facility Education Concept design — Not published · Concept design Details
    Concept render of the clean energy training facility and its forecourt

    Concept design for the Pilbara Development Commission: training in hydrogen, solar, wind and storage around a double-height workshop of about 1,800 m².

    Role
    Concept design
    Value
    Not published
    Date
    2022–ongoing
    Sector
    Education

    Key personnel

    • Brett Priest — Project Director, Project Architect
    • Vitas Silvestri — Design Lead
    • Kim Doan — Documentation, Graphics

    Source: MPS Architects project notes. Image is a render.

Showing all 25 projects.